Restoration by Volunteers
2019 Robbins Reef Lighthouse - after window restoration
2014 Robbins Reef Lighthouse - before window restoration
Lantern Gallery - railings, after
Lantern Gallery - railings before
2018; Newly renovated stairwell after restoration.
2017; The formidable stairwell before restoration
2019 Watch Gallery - railings & floor, after restoration
2018 Watch Gallery - railings & floor, before restoration
2019 Watch Gallery - exterior, after
2018 Watch Gallery - exterior, before
2018 Dog door, after
2018 Dog door, before
2018 Watch Gallery - ceiling, after
2018 Dog door, before
2018 Light Gallery - ventilation disks, after
2018 Light Gallery - ventilation disks, before
The Lantern Gallery after scraping, caulking, priming and painting.
One of the six ventilators we restored.
2018 The Lantern Gallery’s beadboard wall
and screened ventilator
Lantern Gallery, ceiling after
2018 Lantern Gallery, ceiling before
2016 Sitting Room – after
2016 Sitting Room – before
2017; The Crew stripped, sanded, varnished, and hung them with fixtures.
2016; Part of the process of stripping the doors entailed removing the paint.
2016 Kitchen – after
2013 Kitchen – before
2019 Cellar – after professional cleaning
2018 Cellar – before professional cleaning

